<?xml version="1.0" encoding="utf-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0" xml:base="https://www.mcdermott.com/">
  <channel>
    <title>Offshore Wind</title>
    <link>https://www.mcdermott.com/</link>
    <description/>
    <language>en</language>
    
    <item>
  <title>TenneT BalWin4, LanWin1</title>
  <link>https://www.mcdermott.com/projects/tennet-balwin4-lanwin1</link>
  <description>&lt;span class="field field--name-title field--type-string field--label-hidden"&gt;&lt;h2&gt;&lt;a href="https://www.mcdermott.com/projects/tennet-balwin4-lanwin1" hreflang="en"&gt;TenneT BalWin4, LanWin1&lt;/a&gt;&lt;/h2&gt;&lt;/span&gt;

      &lt;div class="field field--name-field-project-metrics field--type-entity-reference-revisions field--label-hidden field__items"&gt;
              &lt;div class="field__item"&gt;  &lt;div class="paragraph paragraph--type--metrics paragraph--view-mode--default"&gt;
          
            &lt;div class="field field--name-field-metric-title field--type-string field--label-hidden field__item"&gt;2 2GW&lt;/div&gt;
      
            &lt;div class="clearfix text-formatted field field--name-field-metric-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;HVDC marine stations&lt;/p&gt;&lt;/div&gt;
      
      &lt;/div&gt;
&lt;/div&gt;
              &lt;div class="field__item"&gt;  &lt;div class="paragraph paragraph--type--metrics paragraph--view-mode--default"&gt;
          
            &lt;div class="field field--name-field-metric-title field--type-string field--label-hidden field__item"&gt;2023&lt;/div&gt;
      
            &lt;div class="clearfix text-formatted field field--name-field-metric-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;awarded&lt;/p&gt;&lt;/div&gt;
      
      &lt;/div&gt;
&lt;/div&gt;
          &lt;/div&gt;
  


  &lt;div class="clearfix text-formatted field field--name-field-highlights field--type-text-long field--label-above"&gt;
    &lt;div class="field__label"&gt;Highlights&lt;/div&gt;
              &lt;div class="field__item"&gt;&lt;ul&gt;&lt;li dir="ltr"&gt;Design, fabricate, install, and commission the offshore converter substation platforms for two 2GW HVDC grid connection systems, BalWin4 and LanWin1.&lt;/li&gt;&lt;li dir="ltr"&gt;Convert up to 2GW of offshore wind-generated electricity from 66 kV alternating current (AC) to 525 kV direct current (DC) to facilitate efficient electricity transmission to the onshore station.&lt;/li&gt;&lt;/ul&gt;&lt;/div&gt;
          &lt;/div&gt;

            &lt;div class="clearfix text-formatted field field--name-field-project-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;The fabrication of BalWin4 will begin in 2025 with a commissioning date of 2029, while the LanWin1 platform’s fabrication, installation and commission follows a year later, reaching completion in 2030. These platforms' main objective is to convert up to 2GW of offshore wind-generated electricity from 66kV alternating current to 525kV direct current. This conversion facilitates efficient transmission of electricity to the onshore station, enabling the integration of renewable energy sources into the power grid at a significant scale.&lt;/p&gt;&lt;p dir="ltr"&gt;&amp;nbsp;&lt;/p&gt;&lt;/div&gt;
      
            &lt;div class="field field--name-field-solutions-category field--type-entity-reference field--label-hidden field__item"&gt;Offshore Wind&lt;/div&gt;
      
            &lt;div class="field field--name-field-spotlight-image field--type-image field--label-hidden field__item"&gt;  &lt;img loading="eager" src="https://www.mcdermott.com/sites/default/files/styles/webp/public/2024-10/TenneT%20BalWin4.png.webp?itok=FF6HViZJ" width="864" height="576" alt="TenneT BalWin4" class="image-style-webp"&gt;


&lt;/div&gt;
      
  &lt;div class="field field--name-field-location field--type-string field--label-above"&gt;
    &lt;div class="field__label"&gt;Location&lt;/div&gt;
              &lt;div class="field__item"&gt;Offshore Germany&lt;/div&gt;
          &lt;/div&gt;

  &lt;div class="field field--name-field-scope field--type-string field--label-above"&gt;
    &lt;div class="field__label"&gt;Scope&lt;/div&gt;
              &lt;div class="field__item"&gt;EPFIC&lt;/div&gt;
          &lt;/div&gt;
</description>
  <pubDate>Mon, 26 Aug 2024 09:42:23 +0000</pubDate>
    <dc:creator>Anagha.Puranik@mcdermott.com</dc:creator>
    <guid isPermaLink="false">176 at https://www.mcdermott.com</guid>
    </item>
<item>
  <title>TenneT BorWin 6 Land Station</title>
  <link>https://www.mcdermott.com/projects/tennet-borwin-6-land-station</link>
  <description>&lt;span class="field field--name-title field--type-string field--label-hidden"&gt;&lt;h2&gt;&lt;a href="https://www.mcdermott.com/projects/tennet-borwin-6-land-station" hreflang="en"&gt;TenneT BorWin 6 Land Station&lt;/a&gt;&lt;/h2&gt;&lt;/span&gt;

      &lt;div class="field field--name-field-project-metrics field--type-entity-reference-revisions field--label-hidden field__items"&gt;
              &lt;div class="field__item"&gt;  &lt;div class="paragraph paragraph--type--metrics paragraph--view-mode--default"&gt;
          
            &lt;div class="field field--name-field-metric-title field--type-string field--label-hidden field__item"&gt;380 kV/220 kV&lt;/div&gt;
      
            &lt;div class="clearfix text-formatted field field--name-field-metric-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;transmission grid&lt;/p&gt;&lt;/div&gt;
      
      &lt;/div&gt;
&lt;/div&gt;
              &lt;div class="field__item"&gt;  &lt;div class="paragraph paragraph--type--metrics paragraph--view-mode--default"&gt;
          
            &lt;div class="field field--name-field-metric-title field--type-string field--label-hidden field__item"&gt;43 million end consumers&lt;/div&gt;
      
            &lt;div class="clearfix text-formatted field field--name-field-metric-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;will benefit from a stable electricity supply&lt;/p&gt;&lt;/div&gt;
      
      &lt;/div&gt;
&lt;/div&gt;
          &lt;/div&gt;
  


  &lt;div class="clearfix text-formatted field field--name-field-highlights field--type-text-long field--label-above"&gt;
    &lt;div class="field__label"&gt;Highlights&lt;/div&gt;
              &lt;div class="field__item"&gt;&lt;ul&gt;&lt;li dir="ltr"&gt;HVDC land station&amp;nbsp;&lt;/li&gt;&lt;li dir="ltr"&gt;Engineering, procurement, construction, and commissioning of the onshore land station&amp;nbsp;&lt;/li&gt;&lt;li dir="ltr"&gt;Groundbreaking ceremony held in&amp;nbsp;Büttel in August 2024&lt;/li&gt;&lt;/ul&gt;&lt;/div&gt;
          &lt;/div&gt;

            &lt;div class="clearfix text-formatted field field--name-field-project-description field--type-text-long field--label-hidden field__item"&gt;&lt;p dir="ltr"&gt;Electricity generated at sea is directly fed into the onshore converter platform where the conversion of AC into direct current (DC) takes place. The electricity is transported by submarine cable to shore and then by underground cable to the onshore converter station, where it is converted back into three-phase current and fed into the extra-high voltage grid. Economically speaking, this innovative technology leads to enormous cost savings.&lt;/p&gt;&lt;/div&gt;
      
            &lt;div class="field field--name-field-solutions-category field--type-entity-reference field--label-hidden field__item"&gt;Offshore Wind&lt;/div&gt;
      
            &lt;div class="field field--name-field-spotlight-image field--type-image field--label-hidden field__item"&gt;  &lt;img loading="eager" src="https://www.mcdermott.com/sites/default/files/styles/webp/public/2024-10/TenneT%20BorWin6%20Land%20Station%20Project.png.webp?itok=R2NoX5iW" width="864" height="576" alt="TenneT Land Station" class="image-style-webp"&gt;


&lt;/div&gt;
      
  &lt;div class="field field--name-field-location field--type-string field--label-above"&gt;
    &lt;div class="field__label"&gt;Location&lt;/div&gt;
              &lt;div class="field__item"&gt;Germany&lt;/div&gt;
          &lt;/div&gt;

  &lt;div class="field field--name-field-scope field--type-string field--label-above"&gt;
    &lt;div class="field__label"&gt;Scope&lt;/div&gt;
              &lt;div class="field__item"&gt;EPFC&lt;/div&gt;
          &lt;/div&gt;
</description>
  <pubDate>Mon, 26 Aug 2024 09:39:11 +0000</pubDate>
    <dc:creator>Anagha.Puranik@mcdermott.com</dc:creator>
    <guid isPermaLink="false">171 at https://www.mcdermott.com</guid>
    </item>
<item>
  <title>TenneT BorWin 6 OSS</title>
  <link>https://www.mcdermott.com/projects/tennet-borwin-6-oss</link>
  <description>&lt;span class="field field--name-title field--type-string field--label-hidden"&gt;&lt;h2&gt;&lt;a href="https://www.mcdermott.com/projects/tennet-borwin-6-oss" hreflang="en"&gt;TenneT BorWin 6 OSS&lt;/a&gt;&lt;/h2&gt;&lt;/span&gt;

      &lt;div class="field field--name-field-project-metrics field--type-entity-reference-revisions field--label-hidden field__items"&gt;
              &lt;div class="field__item"&gt;  &lt;div class="paragraph paragraph--type--metrics paragraph--view-mode--default"&gt;
          
            &lt;div class="field field--name-field-metric-title field--type-string field--label-hidden field__item"&gt;900MW HVDC&lt;/div&gt;
      
            &lt;div class="clearfix text-formatted field field--name-field-metric-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;marine station&lt;/p&gt;&lt;/div&gt;
      
      &lt;/div&gt;
&lt;/div&gt;
              &lt;div class="field__item"&gt;  &lt;div class="paragraph paragraph--type--metrics paragraph--view-mode--default"&gt;
          
            &lt;div class="field field--name-field-metric-title field--type-string field--label-hidden field__item"&gt;4,800 T&lt;/div&gt;
      
            &lt;div class="clearfix text-formatted field field--name-field-metric-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;reference plant and design&lt;/p&gt;&lt;/div&gt;
      
      &lt;/div&gt;
&lt;/div&gt;
              &lt;div class="field__item"&gt;  &lt;div class="paragraph paragraph--type--metrics paragraph--view-mode--default"&gt;
          
            &lt;div class="field field--name-field-metric-title field--type-string field--label-hidden field__item"&gt;17,600 t &lt;/div&gt;
      
            &lt;div class="clearfix text-formatted field field--name-field-metric-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;topsides Wt.&lt;/p&gt;&lt;/div&gt;
      
      &lt;/div&gt;
&lt;/div&gt;
              &lt;div class="field__item"&gt;  &lt;div class="paragraph paragraph--type--metrics paragraph--view-mode--default"&gt;
          
            &lt;div class="field field--name-field-metric-title field--type-string field--label-hidden field__item"&gt;36.8m&lt;/div&gt;
      
            &lt;div class="clearfix text-formatted field field--name-field-metric-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;water depth&lt;/p&gt;&lt;/div&gt;
      
      &lt;/div&gt;
&lt;/div&gt;
          &lt;/div&gt;
  


  &lt;div class="clearfix text-formatted field field--name-field-highlights field--type-text-long field--label-above"&gt;
    &lt;div class="field__label"&gt;Highlights&lt;/div&gt;
              &lt;div class="field__item"&gt;&lt;ul&gt;&lt;li dir="ltr"&gt;Engineering, procurement, fabrication, transportation, installation and commissioning for topside module and the jacket plus piles&lt;/li&gt;&lt;/ul&gt;&lt;/div&gt;
          &lt;/div&gt;

            &lt;div class="clearfix text-formatted field field--name-field-project-description field--type-text-long field--label-hidden field__item"&gt;&lt;p&gt;The project reached one million work hours without a lost-time incident during the fabrication of the platform at the Jebel Ali yard in Dubai. Another impressive milestone was the&amp;nbsp;safe and successful stacking of deck level one and double bottom which was conducted in a tandem lift involving an arrangement of six cranes. This complex operation had a lift weight of 1,962 MT and represented the heaviest stacking ever performed at Jebel Ali.&lt;/p&gt;&lt;/div&gt;
      
            &lt;div class="field field--name-field-solutions-category field--type-entity-reference field--label-hidden field__item"&gt;Offshore Wind&lt;/div&gt;
      
            &lt;div class="field field--name-field-spotlight-image field--type-image field--label-hidden field__item"&gt;  &lt;img loading="eager" src="https://www.mcdermott.com/sites/default/files/styles/webp/public/2024-10/BorWin6_Home.png.webp?itok=eSdapv3y" width="864" height="576" alt="TenneT BorWin 6 OSS" class="image-style-webp"&gt;


&lt;/div&gt;
      
  &lt;div class="field field--name-field-location field--type-string field--label-above"&gt;
    &lt;div class="field__label"&gt;Location&lt;/div&gt;
              &lt;div class="field__item"&gt;Offshore Germany&lt;/div&gt;
          &lt;/div&gt;

  &lt;div class="field field--name-field-scope field--type-string field--label-above"&gt;
    &lt;div class="field__label"&gt;Scope&lt;/div&gt;
              &lt;div class="field__item"&gt;EPFC&lt;/div&gt;
          &lt;/div&gt;
</description>
  <pubDate>Mon, 26 Aug 2024 09:34:00 +0000</pubDate>
    <dc:creator>Anagha.Puranik@mcdermott.com</dc:creator>
    <guid isPermaLink="false">166 at https://www.mcdermott.com</guid>
    </item>

  </channel>
</rss>
